Featured Projects

Electrical Power Engineering

CTCI REI is an excellent integrated services provider of major turnkey power projects in Taiwan.

  • Cha-Yi Primary Substation Construction Turnkey Project
    Cha-Yi Primary Substation is located at Ping Tung Export Processing Zone. The site base is 90 meters in length and 65 meters in width, and total area is up to 6,049 square meters. The eastern side is by a sugarcane field and eastern side is by a garbage ground. The southern side is a 5 meters road connecting to the county line 189. The new SRC substation building is a four floor building with an underground basement, which is 66 meters in length and 30 meters in width, and up to 7000 square meters in floor area.

Subscribe to/Unsubscribe
from Group's Newsletter
Subscribe to the Group newsletter